New construction of a reinforced concrete basin as part of an extension of a water treatment plant

Underground construction
Pipeline construction
Customer Currenta GmbH & Co. OHG
Location Leverkusen-Bürrig, Germany
Order value € 3,500,000
Core construction time 15 months
Man Hours About 12,000

Project:

  • Excavation work
  • Canalization / pipeline construction
  • Roads and Asphalt construction
  • Concrete construction
  • Reinforced concrete construction
  • Work during ongoing operation
  • 12,700 m³ excavation
  • 4,200 m³ concrete
  • 780 t reinforcement
  • 8,100 m² formwork
  • 950 m pipeline construction
  • 190 m cable trenches
  • 2,700 m² asphalt
  • 2,200 m grounding
  • 1,500 m³ gravel
  • 650 m² surface protection