Shell construction of a production building for technical plastics
Concrete construction & civil engineering
Customer | TICONA GmbH |
---|---|
Location | Frankfurt, Germany |
Order value | € 17,500,000 |
Core construction time | 8 months |
Man Hours | About 30,000 |
Ausgeführte Leistungen:
- Excavation work
- Canalization / pipeline construction
- Road construction
- Concrete construction
- Creation of non-permeable surfaces
- 400 m³ excavation
- 29,000 m³ concrete
- 5,400 t reinforcement
- 40,000 m² formwork
- 700 m pipeline construction
- 100 m cable trenches
- 5 stairwells (up to 54 m)
- 6,200 m² slip formwork
- 1,000 m² prefab parts
- 68 t anchor bolts
- 8,000 Lenton reinforcement sleeves