Shell construction of a production building for technical plastics

Concrete construction & civil engineering
Customer TICONA GmbH
Location Frankfurt, Germany
Order value € 17,500,000
Core construction time 8 months
Man Hours About 30,000

Ausgeführte Leistungen:

  • Excavation work
  • Canalization / pipeline construction
  • Road construction
  • Concrete construction
  • Creation of non-permeable surfaces
  • 400 m³ excavation
  • 29,000 m³ concrete
  • 5,400 t reinforcement
  • 40,000 m² formwork
  • 700 m pipeline construction
  • 100 m cable trenches
  • 5 stairwells (up to 54 m)
  • 6,200 m² slip formwork
  • 1,000 m² prefab parts
  • 68 t anchor bolts
  • 8,000 Lenton reinforcement sleeves