Reference
Turnkey Construction of a Production Plant for Industrial Gases
Concrete construction & civil engineering
Turnkey Construction of a Production Plant for Industrial Gases
For our client Air Liquide, we delivered the turnkey construction of a state‑of‑the‑art production facility for industrial gases. The project comprised extensive earthworks, concrete and reinforced‑concrete works as well as the complete interior construction. Special requirements — such as precise formwork and reinforcement works, complex sewer and pipeline construction, and the creation of media‑tight surfaces — were successfully implemented.
Additionally, we took on the technical building services including planning, and all works were carried out during ongoing operations.
Figures and facts:
- Excavation work
- Canalization / pipeline construction
- Roads and Asphalt construction
- Concrete construction
- Reinforced concrete construction
- Interior fit-out
- Work during ongoing operation
- Creation of non-permeable surfaces
- Technical building installations incl. planning
Implementation planning
- 6,300 m³ excavation
- 5,700 m³ concrete
- 620 t reinforcement
- 9,250 m² formwork
- 1,050 m² facade
- 1,480 m pipeline construction
- 100 m cable trenches
- 2,800 m² asphalt
- 975 m² WHG storage areas
- 1,420 m² concrete walkways and roads
- 23 t built-in components
- 12,000 m cable
- 1,200 m² ventilation duct
| Customer | Air Liquide Global E&C Solutions Germany GmbH |
|---|---|
| Location | Dormagen, Germany |
| Contract value | approx. €9 million |
| Main construction period | 20 months |