We work safe –
or not at all.

Mainka specializes in construction projects in safety-critical industries such as chemicals, energy, and logistics. With clear processes, trained personnel, and a safety culture that is put into practice, our accident rate is a fraction of the average for the construction industry.

Mainka at a glance

Total output 2025

> 330

€ million p.a.

Founded

1895/1949

Branches

8
  • Lingen (head office)
  • Brunsbüttel
  • Gelsenkirchen
  • Cologne
  • Münster
  • Osnabrück
  • Papenburg
  • Wuppertal

Mainka employees

> 750

Accident statistics

Services

Construction projects for chemicals, energy and logistics

We plan, construct, renovate and maintain industrial buildings safely, reliably and with many years of experience. Our focus is on complex projects in sensitive industrial environments such as chemical parks, power stations, refineries, energy infrastructure and large logistics sites.

Reference

New construction tanker bridge TSA3

Concrete construction & civil engineering

Construction of the TSA3 Tanker Bridge

For our client Currenta, we constructed a tanker ship loading platform located directly in the middle of the Rhine — a technically demanding project with unique challenges. The prestressed‑concrete loading platform rests on an oval pylon and was built within the protection of a sheet‑pile cofferdam.

In addition to concrete and reinforced‑concrete works, our scope included the creation of media‑tight surfaces and complex formwork and reinforcement tasks. Thanks to meticulous planning and close coordination, the project was completed safely and on schedule despite the risk of flooding.

Figures and facts:

  • Concrete works
  • Reinforced concrete works
  • Production of media-tight surfaces
  • Interior works
  • Formwork and reinforcement works

The project included:

  • 704 m³ concrete
  • 251 t reinforcement
  • 854 m² formwork
Customer Currenta GmbH & Co. OHG
Location Leverkusen, Germany
Contract value approx. €2 million
Main construction period 17 months
Man hours ca. 11.000
References

Similar references

Schlüsselfertiger Neubau einer Industriehalle in Hilden
Concrete construction & civil engineeringTurnkey constructionPipeline constructionIndustrial maintenanceUnderground construction
Neubau Covestro Campus Lot 1 in Leverkusen – Beton- und Ingenieurbau
Concrete construction & civil engineering
Concrete construction & civil engineering

Of our more than 750 employees, around 60% are construction site personnel, whom we train regularly. On average, we devote 2% of annual working hours to training.

order structure

For whom and why?

We generate more than 90% of our turnover in the chemical, energy and specialised logistics sectors. Customers from these sectors trust in our experience because we construct complex industrial buildings reliably and safely.