New construction of a test hall with administration building and a traversing hall
Turnkey construction
Concrete construction & civil engineering
Underground construction
Traffic area construction
Pipeline construction
Industrial maintenance
Customer | NKT Holding |
---|---|
Location | Cologne, Germany |
Core construction time | 14 months |
Ausgeführte Leistungen:
Construction project:
- Turnkey construction
- Technical building equipment
- Civil engineering
- Concrete construction works
- Road construction works
- Asphalt construction incl. semi-rigid surface course
- Pipeline construction
The project included:
- 39.300m³ BRI test and traversing hall
- 2000m² industrial floor for hovercrafts
- 750m² GFA administration building
- 3500m² semi-rigid surface layer as storage area for up to 150t. heavy cable spools
- Construction of an underground ice storage for building heating and process cooling with 8m diameter and 6m height
- Construction of an underground rainwater retention basin in concrete structure
- Laying of 450m PE-HD pipeline up to DN710