New construction of a test hall with administration building and a traversing hall

Turnkey construction
Concrete construction & civil engineering
Underground construction
Traffic area construction
Pipeline construction
Industrial maintenance
Customer NKT Holding
Location Cologne, Germany
Core construction time 14 months

Ausgeführte Leistungen:

Construction project: 

  • Turnkey construction
  • Technical building equipment
  • Civil engineering
  • Concrete construction works
  • Road construction works
  • Asphalt construction incl. semi-rigid surface course
  • Pipeline construction

The project included:

  • 39.300m³ BRI test and traversing hall
  • 2000m² industrial floor for hovercrafts
  • 750m² GFA administration building
  • 3500m² semi-rigid surface layer as storage area for up to 150t. heavy cable spools
  • Construction of an underground ice storage for building heating and process cooling with 8m diameter and 6m height
  • Construction of an underground rainwater retention basin in concrete structure
  • Laying of 450m PE-HD pipeline up to DN710