Renovation and redesign of the building complex

Pipeline construction
Concrete construction & civil engineering
Customer Bayer AG
Location Leverkusen
Order value ca. 35.000.000 €
Core construction time 23 months

Ausgeführte Leistungen:

  • Detailed design
  • Earthworks
  • sewer / pipeline construction
  • Reinforced concrete works
  • Road works
  • Concrete works
  • Formwork and reinforcement works 
  • Technical building equipment
  • Interior works
  • Production of media-tight surfaces
  • finishing works
  • Work during operation
  • Facade works
  • Paving

The project included:

  • 5,000 m² GFA
  • Renovation and complete replacement of the existing slate roof covering
  • Replacement of the complete ventilation and air conditioning system
  • Conversion of the existing building without restricting ongoing canteen operations