Skip to main content

Turnkey construction of a production plant for technical gases

Concrete construction & civil engineering
Customer Air Liquide Global E&C Solutions Germany GmbH
Location Dormagen, Germany
Order value € 9,100,000
Core construction time 20 months
Man Hours About 60,000

Ausgeführte Leistungen:

  • Excavation work
  • Canalization / pipeline construction
  • Roads and Asphalt construction
  • Concrete construction
  • Reinforced concrete construction
  • Interior fit-out
  • Work during ongoing operation
  • Creation of non-permeable surfaces
  • Technical building installations incl. planning
  • Implementation planning
  • 6,300 m³ excavation
  • 5,700 m³ concrete
  • 620 t reinforcement
  • 9,250 m² formwork
  • 1,050 m² facade
  • 1,480 m pipeline construction
  • 100 m cable trenches
  • 2,800 m² asphalt
  • 975 m² WHG storage areas
  • 1,420 m² concrete walkways and roads
  • 23 t built-in components
  • 12,000 m cable
  • 1,200 m² ventilation duct