Turnkey construction of a production plant for technical gases
Concrete construction & civil engineering
Customer | Air Liquide Global E&C Solutions Germany GmbH |
---|---|
Location | Dormagen, Germany |
Order value | € 9,100,000 |
Core construction time | 20 months |
Man Hours | About 60,000 |
Ausgeführte Leistungen:
- Excavation work
- Canalization / pipeline construction
- Roads and Asphalt construction
- Concrete construction
- Reinforced concrete construction
- Interior fit-out
- Work during ongoing operation
- Creation of non-permeable surfaces
- Technical building installations incl. planning
- Implementation planning
- 6,300 m³ excavation
- 5,700 m³ concrete
- 620 t reinforcement
- 9,250 m² formwork
- 1,050 m² facade
- 1,480 m pipeline construction
- 100 m cable trenches
- 2,800 m² asphalt
- 975 m² WHG storage areas
- 1,420 m² concrete walkways and roads
- 23 t built-in components
- 12,000 m cable
- 1,200 m² ventilation duct