Mainka specializes in construction projects in safety-critical industries such as chemicals, energy, and logistics. With clear processes, trained personnel, and a safety culture that is put into practice, our accident rate is a fraction of the average for the construction industry.

Mainka at a glance

Total output 2025

> 330

€ million p.a.

Founded

1895/1949

Branches

8
  • Lingen (head office)
  • Brunsbüttel
  • Gelsenkirchen
  • Cologne
  • Münster
  • Osnabrück
  • Papenburg
  • Wuppertal

Mainka employees

> 750

Accident statistics

Services

Construction projects for chemicals, energy and logistics

We plan, construct, renovate and maintain industrial buildings safely, reliably and with many years of experience. Our focus is on complex projects in sensitive industrial environments such as chemical parks, power stations, refineries, energy infrastructure and large logistics sites.

Reference

Turnkey Construction of a Production Plant for Industrial Gases

Concrete construction & civil engineering

Turnkey Construction of a Production Plant for Industrial Gases

For our client Air Liquide, we delivered the turnkey construction of a state‑of‑the‑art production facility for industrial gases. The project comprised extensive earthworks, concrete and reinforced‑concrete works as well as the complete interior construction. Special requirements — such as precise formwork and reinforcement works, complex sewer and pipeline construction, and the creation of media‑tight surfaces — were successfully implemented.
Additionally, we took on the technical building services including planning, and all works were carried out during ongoing operations.

Figures and facts:

  • Excavation work
  • Canalization / pipeline construction
  • Roads and Asphalt construction
  • Concrete construction
  • Reinforced concrete construction
  • Interior fit-out
  • Work during ongoing operation
  • Creation of non-permeable surfaces
  • Technical building installations incl. planning
  • Implementation planning

     

  • 6,300 m³ excavation
  • 5,700 m³ concrete
  • 620 t reinforcement
  • 9,250 m² formwork
  • 1,050 m² facade
  • 1,480 m pipeline construction
  • 100 m cable trenches
  • 2,800 m² asphalt
  • 975 m² WHG storage areas
  • 1,420 m² concrete walkways and roads
  • 23 t built-in components
  • 12,000 m cable
  • 1,200 m² ventilation duct
Customer Air Liquide Global E&C Solutions Germany GmbH
Location Dormagen, Germany
Contract value approx. €9 million
Main construction period 20 months
References

Similar references

Schlüsselfertiger Neubau einer Industriehalle in Hilden
Concrete construction & civil engineeringTurnkey constructionPipeline constructionIndustrial maintenanceUnderground construction
Neubau Tankerbrücke TSA3 in Leverkusen – Ingenieurbauwerk
Concrete construction & civil engineering
Neubau Covestro Campus Lot 1 in Leverkusen – Beton- und Ingenieurbau
Concrete construction & civil engineering

Of our more than 750 employees, around 60% are construction site personnel, whom we train regularly. On average, we devote 2% of annual working hours to training.

order structure

For whom and why?

We generate more than 90% of our turnover in the chemical, energy and specialised logistics sectors. Customers from these sectors trust in our experience because we construct complex industrial buildings reliably and safely.