Extension of production building
Concrete construction & civil engineering
Traffic area construction
Underground construction
Customer | BASF Polyurethanes GmbH |
---|---|
Location | Lemförde, Germany |
Order value | € 8,800,000 |
Core construction time | 19 months |
Man Hours | About 60,000 |
Ausgeführte Leistungen:
- Concrete construction
- Reinforced concrete construction
- Excavation work
- Road construction / asphalt construction
- Creation of non-permeable surfaces
- Canalization / pipeline construction
- Work during ongoing operation
- 47,000 m³ excavation
- 5,400 m³ concrete
- 850 t reinforcement
- 6,000 m² formwork
- 800 m² WHG storage areas
- 11,000 m² asphalt
- 1,200 m² facade
- 760 m cable trenches
- 2,200 m pipeline construction